Session 182 - August 23, 2020: Felted channels, powdered paint
- S.Young
- Aug 23, 2020
- 1 min read
Updated: Sep 19, 2022
As the end of the proverbial tunnel began coming into sight, we realized that a solution might be needed to ensure the desktop (with both pieces attached) could be transported safely without undue flex and/or tension on the connecting edges and sliding dovetails. B's solution was to have two 6' long powder-coated steel tracks manufactured, which we covered in brown felt using a Super 77 Spray Adhesive.
Comments